This paper discusses the points of creating excellence in the road and bridge construction project on-site.
本文主要对路桥工程现场施工中创优要点进行探讨。
However, because of the abstruse symbolic logic and complex formula catastrophe theory is seldom used for the research of bridge construction project optimization.
但是,由于突变理论有着高深的数理逻辑结构和推演规则,其应用却未在方案优选中得到应有的推广。
Firstly, the thesis compares BT project modes at home and abroad, shows the differences and provides the reference for the operation model of the Yangtze River Bridge Construction project.
首先,本文对国内外BT项目模式进行了对比,揭示二者的差异,为构建长江大桥项目运作模式提供了参考依据。
应用推荐