The management of a 210 square meters office building, brick-concrete structure.
管理办公楼一栋210平方米, 砖混结构。
The demolition scheme, technological parameters, safety and protection measures of the controlled blasting for demolishing a four-storey framed and brick-concrete structure building are introduced.
本文介绍一座四层框架与砖混混合结构办公楼房的爆破拆除方案、技术参数、爆破安全及防护措施。
Setting reinforced concrete constructional column is a kind of measures to enhance the earthquake resistance of high rise brick masonry structure building. This method has been widely adopted.
设置钢筋混凝土构造柱是提高多层砖混结构房屋抗震能力的一种措施,已被普遍采用。
应用推荐