Inspectors know have bad board, to the small quantity of board for heavy inspection, to follow the confirmation OQC.
检验员知道有不良板少数量,要对整批板子进行重检,OQC要跟踪确认。
The vessel is registered with the National Board of Boiler and Pressure Vessel Inspectors, meets requirements of CSD-1 of the ASME Code, and is built to Section IV of the ASME code.
该容器已经通过国家锅炉及压力容器检验协会的检验,符合美国机械工程师协会CSD-1的要求,满足美国机械工程师协会标准。
应用推荐