Some stabilizing structures must be set before cutting a bedding high rock slope, and how to determinate the range of disturbed zone becomes the key problem.
开挖顺层岩石高边坡,往往需要进行预加固,因而合理确定坡体开挖松动区范围就便成为核心问题。
The utility model solves the problem of the existing die cutter needing the bedding under the stamping-out object to keep the cutting plane of the cutter parallel with the stamping-out plane.
本实用新型解决了现有模切机需在被冲压物下面进行铺垫才能使刀具切割平面与被冲压面平行的问题。
应用推荐