Based on the theoretical and quantitative analysis, we have formed the theoretical foundation for building the platform, and provided measurement indicators and the categorized capacity model.
以上理论研究和定量分析,形成了建设测评系统的理论基础,提供了测评指标和能力模型分类依据。
The existing problems on capacity building of disposing environmental emergent event in Jingdong town are analyzed based on the facts of Jingdong. The measures and suggestions are put forward.
从景东县实际情况出发,针对目前号东县在环境应急能力建设方面存在的问题进行了分析,并提出了相应的对策、措施和建议。
A new concept, the generation system outage capacity probationary model, is presented. Based on this concept, a practical algorithm for building generation system outage capacity model is proposed.
提出了发电系统停运容量预备表的概念,并据此给出了先形成发电系统停运容量预备表,再建立发电系统停运容量模型的实用算法。
应用推荐