river-bank spillway 河岸式溢洪道
Design specification for river-bank spillway 溢洪道设计规范
left bank spillway 左岸溢洪道
high-head bank spillway 高水头岸边式溢洪道
spillway on bank 岸边溢洪道
bank slope spillway 岸坡式溢洪道
bank-run spillway 岸边式溢洪道
The Xiaoshan Hydropower Station consists of reinforced concrete face rockfill dam, bank spillway, diversion system and power house.
小山水电站工程由钢筋混凝土面板堆石坝、岸坡溢洪道、引水系统及发电厂房组成。
The right bank spillway tunnel at Lubuge hydropower station is the most important passageway of water discharging and sediment flushing.
鲁布革水电站右岸泄洪洞承担着鲁布革大坝泄洪、排沙、放空水库的任务,是最重要的泄洪、排沙通道。
This paper presents a design example of using a cable crane for lifting and erecting an access bridge for the right bank spillway tunnel for the Lubuge Hydropower Station.
这里介绍了应用于鲁布革右岸泄洪洞交通桥吊装的缆索起重机的设计实例。
应用推荐