When you are testing a monitor model within the Monitor Test Environment, use the Web-based dashboards, as they are identical to those in the deployed, production environment.
当您在 Monitor 测试环境中测试监视器模型时,请使用基于 Web 的仪表板,因为它们与已部署的生产环境中的仪表板完全相同。
As the world moves from a production-centric model of industry to one focused on consumer requirements, design and creativity become ever more important.
随着世界从以生产为中心的行业模式转向以消费者需求为中心的行业模式,设计和创意变得更加重要。
The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.
建立了热轧无缝钢管主生产计划问题的混合整数线性规划模型。
应用推荐