At present, artificial ground motion simulation includes the method of seismic and engineering methods.
当前,人造地震动的模拟方法,主要有地震学方法和工程学方法。
参考来源 - 小波分析方法模拟地震动的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
By introducing a number of natural and artificial ground motion records into structural analysis, the relationship between earthquake duration and energy absorbed by structures was obtained.
通过大量人工波及天然地震记录输入结构的分析,我们得到了地震动持续时间与结构弹塑性耗能之间的关系。
A new method which improves the fitting accuracy of artificial time history of ground motion to the target response spectrum by superimposing narrowband time histories in the time domain is proposed.
提出了一种在时域内叠加窄带时程的方法以提高人造地震动时程对目标反应谱的拟合精度。
应用推荐