·2,447,543篇论文数据,部分数据来源于NoteExpress
并指出,若是高边坡一侧的单输水系统方案,则输水廊道墙在外水压下的应力,将可能达到严重的程度。
The results also show that if only one side filling and emptying system beneath the high rock slope is operated, the stresses under external water pressure would be serious.
youdao
应用推荐
模块上移
模块下移
不移动