随着隧道施工机械化程度的提高,在特长小断面隧道工程中采用钻爆法掘进施工,其机械配套是制约掘进速度的重要条件。
With the development of mechanization and drill and blast in extra - long tunnels with a small section, the matching machinery is very important to driving speed.
盾构掘进法开挖隧道引起的地表沉降对地面建筑物影响在地下工程施工中越来越受到人们的关注,而这个问题的关键是要对地表沉降进行预估。
The influence of surface subsidence on ground building, caused by shield tunneling is concerned by more people, but the key of this problem is to pre-estimate the surface subsidence.
以渝怀铁路人和场隧道爆破施工为背景,采用动力有限元法对浅埋隧道掘进爆破引起的地表震动效应进行了数值模拟。
By taking a shallow tunnel on the Yuhuai railway as the research object, ground vibration induced by blasting was simulated numerically using a dynamic finite element method.
应用推荐