信息应用于当前和未来有相似性质的项目产品质量、寿命可靠性、耐久性、可维修性、适时性以及成本的目标。
The information shall use for for current and future projects of a similar nature, targets for product quality, life, reliability, durability, maintainability , timing and cost.
作者就作业适时性产值损失以及与作业成本的协调等问题进行了计算与讨论。
In this paper, the problem of harmonizing the output value losses in timely field operations with the operation cost of agricultural machinery was calculated and analysed.
应用推荐