压力控制器调整完毕,处于正常自动控制状态。
Pressure controller regulating, and it's under auto controlling status.
待全部调整完毕后,进行整体立面平整度的检查,确认无误后,进行打胶。
When all the adjustments are done, check the evenness of the integral façade. After it has been confirmed correct, carry out sealant installation.
一旦中期上行调整浪运行完毕,将恢复长期的下行趋势。
Once the upward correction is completed, the longer term downward trend should resume, until then more upside is possible in the medium term.
应用推荐