施工组织设计是编制工程造价的因素之一,编制施工组织设计是十分重要的。
The organized design for building is one of the factors which influence building cost of engineering project.
具备图纸审核能力;具备《施工组织设计》、《招投标》编制与审核能力、具备施工现场钢结构专业及其他专业督导和协调能力;
With ability of drawing audit; with preparation and audit ability of construction organization design& bidding; with good supervision and coordination ability of construction site steel structure.
摘要:水利工程设计概算必须依据设计工程量、施工组织设计,按概算编制规定及概算定额进行编制。
Abstract: Hydraulic engineering design budget must be based on the design engineering, construction management planning, budget preparation and budget quota.
应用推荐