同时还提出了计算机模拟结构体系转换的方法。
It also proposed a simulation method about structural system in construction.
这就必须在上下不同结构体系转换的楼层设置转换层。
Conversion layer arranged this must change the different structure system in the upper and lower floors.
方家寨大桥采用先简支后连续的施工方法,通过逐次接长连续梁、逐次拆除临时支座来实现结构体系转换。
The removal of temporary bearings is one of the key procedures in the construction of transforming a simply-supported bridge structure into a continuous one.
应用推荐