stave sheet
竖钢板
基于1个网页-相关网页
竖吊钢板起重钳 DSQK
竖吊钢板钳 EAGLE CLAMP
·2,447,543篇论文数据,部分数据来源于NoteExpress
板墙筋竖筋分二次绑扎,第一次从底板留出插筋至止水钢板上口留出,搭接倍数,第二次绑扎至顶板面。
Two-time-binding is required for vertical re-bar of plank wall. First binding is made up to water stop plate, second binding is made up to top plate surface.
youdao
应用推荐
模块上移
模块下移
不移动