在板定梁煤矿,矿井已被挖进山体深处,卡车司机开了30分钟才到达采煤工作面,装上煤之后满载而归。
At the small Bandingliang colliery, the pit has been dug so far into the hillside that truck drivers take 30 minutes to reach the coalface, fill up and return with their load.
本文的研究工作对薄膜型LNG船的设计和满载情况分析具有一定的参考价值。
In this paper, the research work on the membrane type LNG carrier design and analysis of full load with a reference value.
应用推荐