针对滑坡治理方案优化选择的复杂性及不确定性,充分考虑地质资料、施工条件、工程经济及环境影响等综合因素,构造多目标优选模型。
Aiming at the complexity and the uncertainty of optimal selection of landslide treatment scheme, taking the geological data, execution conditions, engineering economy, environmental influence and etc.
文章分析了该滑坡的具体情况和治理原则,提出了采用框架式抗滑桩的治理方案,并介绍了具体的施工方法。
T his paper analyzes concrete status of the slide slope and treatment principle, offers the treatment scheme of adopting frame type slide-resistance pile, and describes related construction method.
提出滑坡及危岩综合治理工程中的滑坡监测方案及项目施工组织设计方案,为综合治理工程的顺利实施打下了坚实的基础。
The monitoring system of landslide and the project management design are presented at last, which lays strength foundation for the harness engineering.
应用推荐