Hybrid girder cable-stayed bridge is a new direction in modern large span bridges.
混合梁斜拉桥是今后大跨度发展方向之一。
参考来源 - 混合梁斜拉桥的合理状态与性能研究Composite cable-stayed bridge is a new kind of cable-stayed bridge with perspective future. The joint between the steel box-girder and the concrete box-girder is the key technology by which the composite cable-stayed bridge will be designed.
混合梁斜拉桥是一种具有发展前景的新型的斜拉桥形式,而钢梁与混凝土梁的连接是混合梁斜拉桥设计的关键技术。
参考来源 - 混合梁斜拉桥结合段刚度匹配的研究·2,447,543篇论文数据,部分数据来源于NoteExpress
结合段设计是混合梁斜拉桥设计中的关键技术之一。
Design of composition section is one of the key techniques in design of hybrid beam cable-stayed bridge.
湛江海湾大桥是跨越麻斜海湾的五跨连续漂浮体系混合梁斜拉桥。
Zhanjiang Bay bridge is a 5 span continuous composite cable stayed bridge of floating system across Maxie straits.
鄂东长江大桥为混合梁斜拉桥,PC宽箱梁及钢-混凝土结合段采用C55高性能混凝土。
On the prestressed concrete(PC) wide Box girder and the steel and concrete joint section of the bridge, the C55 high performance concrete is used.
应用推荐