本桩基施工正值清明季节,为使压桩工程能顺利施工,根据气候特点确定相应的措施,以保证工程的质量及工期。
Piles are constructed in Fresh Green season. In order to keep the smooth construction of piles, responding measures are made according to climate to guarantee the quality and time limit of works.
要按照本安体系相关要求,根据自身特点和气候环境特点,搞好季节性安全检查。
According to the relevant requirements of safety system, according to their own characteristics and the characteristics of climate and environment, improve the seasonal safety inspection.
根据混凝土面板产生裂缝的原因,并结合工程区的气候特点,认为控制面板的塑性收缩、干缩与冷缩裂缝是防止裂缝产生的重点。
According to the causes of crack occurrence and the weather characteristics in the project area, it is key to prevent the cracks such as the plastic crack, dry crack and cold shrinkage crack.
应用推荐