给出了结构的特点和节点构造,以及预应力转换梁施工阶段验算结果及预应力筋分段分批张拉的施工顺序。
The checking calculation of the post-stressed concrete transfer beam in the construction period and the stretching sequence of the deformed bar is also introduced.
重点介绍了拔杆的布置原则,施工阶段网壳和拔杆系统的验算及网壳的拼装与提升等过程。
The author also introduces the arrangement rules of pulling bar, checking computations of shell and pulling bar system at the construction stage and assembly...