但是,安装海上风力发电机的一个缺点就是项目成本相对较高,原因是更严峻的现场条件和特殊环境所致的不易接近性。
However, a drawback of installing wind turbines offshore is the slightly higher project costs, caused primarily by the more challenging site conditions and limited accessibility.
并发现对所提出的EB检验,在某些条件下,具有渐近最优性的收敛速率,能够任意接近于1。
It is discovered that convergence rate with asymptotical optimality for the proposed EB test can arbitrarily approach to 1 under certain conditions.
滑移边界条件下的模拟结果具有良好的周期性,各个周期的过渡性也更加平滑,与实际情况更加接近。
The simulation has good period property, the transition between each period is more smooth and is more close to the real result.
应用推荐