同时,在将单元从版本5升级到版本6之前,工作区将通过创建额外的节点和服务器来规划发送移植的容量。
In the meantime, the workaround is to preplan the post-migration capacity by creating additional nodes and servers prior to upgrading the cell from V5 to V6.
扩展:与适应周期性负载相比,升级容量是更常见的扩展情况。
Scaling: Upgrading capacity is a more common case of scaling than is accommodation of cyclical loads.
客户有两个选项,要么投入大量资金升级网络容量,或停止以“主动/主动”方案运行数据中心。
The customer was left with two options, either to invest in a significant upgrade of network capacity, or stop running the data centers as Active/Active.
应用推荐