在反复项目进入尾声之际,您可以使用[未计划工作]报表,判断反复项目中加入了多少未在开始反复项目之初纳入计划中的工作。
Toward the end of an iteration, you can use the Unplanned work report to determine how much work was added to the iteration that was not planned at the start of the iteration.
And one of the things i said from day one is that our entire work has to be based on the best science we can master for the American people.
从一开始工作我就反复强调,我们所有的工作都建立在,为了美国人民所掌握的,最先进的科学知识之上。
应用推荐