考虑供电可靠性并将其转化为停电损失费用来进行经济分析是城市电网规划的必然趋势。
Taking the reliability of power supply into consideration and transforming it into the interruption cost in economy analysis are the necessary trend of the urban network planning.
最终需要停运负荷点时,切负荷策略综合考虑了停电损失费用、停电电量、网损和停电时间因素。
Loss of load cost, energy not severed, net loss and loss of load duration, are considered when deciding which load should be curtailed.
应用推荐