在板定梁煤矿,矿井已被挖进山体深处,卡车司机开了30分钟才到达采煤工作面,装上煤之后满载而归。
At the small Bandingliang colliery, the pit has been dug so far into the hillside that truck drivers take 30 minutes to reach the coalface, fill up and return with their load.
站在历史海岸漫溯那一道道时间的沟梁,因为爱生命才绚丽辉煌。
Man standing on the history of the coast time back in that groove beam lines, as splendid love life was brilliant.
更大高度要求增加柱和梁的尺寸以使建筑物更加坚固,在风荷载作用下建筑物才不会产生超过一个可接受限度的摆动。
Greater height entails increased column and beam sizes to make buildings more rigid so that under wind load they will not sway beyond an acceptable limit.
应用推荐