介绍了秦沈客运专线A14试验段软土路基工程设计施工情况。
The design and construction situations of A14 testing section soft soil roadbed on Qinhuangdao-Shenyang passenger transport special railway line are introduced.
结合秦沈客运专线工程实际进行了干振碎石桩处理震动液化地基技术研究。
This technical study was made on treating vibrating liquefied foundation by dry crushed stone pile based on the project of Shengyang-Qinghuangdao Passenger Dedicated Railway Line.
较详细地介绍了秦沈客运专线和B26 - 1标段的总体工程概况及设计方案。
Detailed introductions are given for the global situation of design and engineering for section B26-1 on Qin-shen passenger railway.
应用推荐