第一期工程临汝一白坪段己建成通车, 全部工程将于2006 年建成。
The first stage engineering has been completed and the entire engineering will be completed in 2006.
相反用白大理石建成的卡拉·卡拉浴场,则较富现代感,面积达1000平方米,有多个室内室外温泉和桑拿浴。
Contrary with white marble built Carla Carla beaches and is relatively rich contemporary sense, area of 1,000square meters, there are multiple indoor and outdoor hot spring and sauna bath.
白石水库位于辽宁省北票市上园乡附近的大凌河干流上,是大凌河流域第一期开发的控制性骨干工程,水库建成后,将产生许多环境工程地质问题。
Baishi Reservior, located on upstream of Daling River close to Sshangyuanxi Village in Beipiao, Liaoning, has been built as a key project in Phase I Development Plan in Daling drainage.
应用推荐