为了监测各工程部位安全状态,设计分别在边坡、坝、洪道、流洞等工程部位布置了相关观测仪器。
In order to monitor project's safety status of every section it is designed to arrange some interrelated instruments at slope dam spillway and diversion tunnel.
洪家渡水电站左岸坝肩工程为当时水利水电建设工程中最大高度的边坡开挖。
The excavation of left bank abutment of the Hongjiadu hydroelectric project was the highest cut slope in the hydropower construction project then.
第1级麓原面(P1)的前缘陡坎为最新断层崖或洪积台地,断层崖的坡脚为断裂带地表出露位置;
The frontal riser of the first pediment surface (P1) is the most recent fault scarp or diluvial platform; at the foot of pediment P1 outcrops the fault.
应用推荐