第一立方米混凝土被安放在未来的大坝的滚木坡上。
First cubic meter of concrete is mounted in the rollway of the future dam.
这一方法不但很好地满足了计算速度的要求,而且也实现了考虑施工阶段边坡分析的目标。
Not only the requirement of the computing speed is met but also the slope analysis of the construction stage is achieved.
通过工程实践,将层状岩体边坡顺层破坏机理归纳为三方面的问题,即:平面旋转滑动、解体滑动和渐进破坏。
Through the engineering practice, the bedding failure mechanisms of bedded rock side-slope could be divided into three types: plane rotatory sliding, disintegration sliding and gradual destruction.
应用推荐