2010年3月,比尔芬格·伯杰宣布预计完工日期为2014年。
In March 2010, Bilfinger Berger announced that the estimated completion date would be in 2014.
多项梧桐河防洪计划的设计工作正在进行,预计完工日期可配合深圳河治理工程,目的是在2002年或之前,可减低发生水浸的危险。
The design of various flood control schemes for the River Indus is progressing with completion dates to tie in with the Shenzhen River regulation project so as to relieve the risk of flooding by 2002.
计划完工日期,是承包商预计工程应完工的日期。
The intended Completion date is the date on which it is intended that the Contractor shall complete the Works.
计划完工日期,是承包商预计工程应完工的日期。
The intended Completion date is the date on which it is intended that the Contractor shall complete the Works.
应用推荐