• 全国电力系统运行中的事故类型统计分析断路器引起非计划停运次数最多

    According to the statistical analysis of the accidental types in the operation of electric power system, the time of unplanned outage of electric power system caused by the circuit breaker is most.

    youdao

  • 及早发现锅炉轻微泄漏避免机组非计划停运缩短检修时间具有积极的意义。

    To discover the minor leakage in boiler on time is significant to avoid unscheduled downtime of power unit and minimize maintenance period.

    youdao

  • 发电容量退出是为了计划维修计划停电或者偶然由于计划或强迫停运

    Generating capacity is taken out of service for scheduled maintenance or planned outage and is occasionally lost on an unplanned or forced outage.

    youdao

  • 发电容量退出是为了计划维修计划停电或者偶然由于计划或强迫停运

    Generating capacity is taken out of service for scheduled maintenance or planned outage and is occasionally lost on an unplanned or forced outage.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定