本文介绍了铜绿山矿全尾砂高水固化充填试验工艺,以及利用该技术实现底柱采场充填接项的试验研究。
Testing and study on utilizing this technology for tightened filling in sill stope in Tonglushan Mine are presented in this paper.
武山铜矿南矿带采用上向水平分层进路水砂充填法回采,采场多次发生冒顶、片帮。
The South ore-bearing zone of Wushan copper mine is mined with ascending horizontal slicing hydraulic fill crosscut mining system. Roof falling and rib spalling occurred in any times.
武山铜矿南矿带采用上向水平分层进路水砂充填法回采,采场多次发生冒顶、片帮。
The South ore-bearing zone of Wushan copper mine is mined with ascending horizontal slicing hydraulic fill crosscut mining system. Roof falling and rib spalling occurred in any times.
应用推荐