• 爆破块体适中大块控制在7%以内,满足机械装运作业,能适合路基填料要求

    After the blasting, the block must be moderate, the bulk rate must be within 7%, can meet the shipment operating machinery, can requirement for roadbed filler.

    youdao

  • 本文公路路基工程施工中的机械配置管理机械施工几个方面进行简述

    This article introduces from the highway roadbed construction mechanical configuration, management and mechanization, and several other aspects of the construction.

    youdao

  • 路基分段作业,先施工路段必须不陡1:5的面,坡必须整平压实,以便施工机械上下路基施工时开台阶。

    When fill earth subgrade exercise part by part. The former part's gradient should be less than 1:5. Slope surface must be flat, so that, the construction machine can move from top to bottom.

    youdao

  • 采用集中搅拌混凝土进行特高压输电线施工具有质量稳定机械化程度、占地环保效应好优点

    Using batch mixing concrete in UHV line foundation construction has many advantages, such as stable quality, highly mechanized, land saving, and eco-friendly, etc.

    youdao

  • 我们还提供全新的路政施工方式,我们机械可以原来施工人员厌烦的不规则的石块砖头,瓦砾完全变成新路的扎实路基

    We provide brand new working plan, our machines can turn the troublesome rocks, broken bricks, cement blocks etc into reliable basement for new roads;

    youdao

  • 采用预制方式机械、工厂化集中均衡大批量生产生产效率适用各种路基尤其适用于填砂路基

    The hollow block can be commercially and mechanically produced by precast method with high production efficiency and is applicable for various roadbeds, in particular to the sand-filled roadbed.

    youdao

  • 路基质量要求技术要求,机械要求,施工程序要求,对路基总体的质量控制有了一个比较全面介绍

    Roadbed from the quality requirements, technical requirements, machinery, construction procedures, roadbed of the overall quality control with a more comprehensive briefing.

    youdao

  • 路基质量要求技术要求,机械要求,施工程序要求,对路基总体的质量控制有了一个比较全面介绍

    Roadbed from the quality requirements, technical requirements, machinery, construction procedures, roadbed of the overall quality control with a more comprehensive briefing.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定