• 技术控制断面超欠提高光面爆破水平效果明显。

    The technology can be used to keep cross-section excavation in control and improve explosion level.

    youdao

  • 通过数据采集进行坐标转换,能够方便地计算测点欠挖

    Through data collection and coordinate transformation, the over-under-excavated values can be obtained easily.

    youdao

  • 严重情况下,隧道稳定性尤其是隧道产生一定影响

    Tunnel stability, especially in soft rock tunnel, will be affected to certain degree for the enormous over-break or under-break of excavation.

    youdao

  • 弹性地基理论基础,建立了上排钢管幕欠挖两种工况的力学计算模型推导出钢管幕的挠度曲线及相应控制方程

    Underexcavation and overexcavation models have been presented based on the elastic foundation beam theory and the corresponding deflection equations and other controlling equations have been deduced.

    youdao

  • 弹性地基理论基础,建立了上排钢管幕欠挖两种工况的力学计算模型推导出钢管幕的挠度曲线及相应控制方程

    Underexcavation and overexcavation models have been presented based on the elastic foundation beam theory and the corresponding deflection equations and other controlling equations have been deduced.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定