计算结果显示了两种蚁群算法在求解多目标资源受限项目调度问题时的优势和对该类问题的适应性,同时也暴露了它们的一些缺陷。
The effectiveness and efficiency of these two algorithms are tested by comparing the results of solving Patterson's 110 problems with some priority based heuristics.
在资源受限的项目调度过程中存在着资源冲突问题,严重影响着项目活动的执行。
There is resources conflict problem in the process of resource-constrained project scheduling, which seriously affects the execution of project activity.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
本文以装甲车辆传动装置设计为例,研究产品设计资源受限项目调度规划方法和优化调度问题求解算法。
Taking transmission design of armored vehicles as an example, this dissertation does research on Resource-Constrained Project Scheduling Problem (RCPSP) for product design and the solving algorithms.
应用推荐