• 协助制作物料需求计划

    Assist to set up the sourcing demands plan;

    youdao

  • 因此,建造一个高效力的物料需求计划系统势在必行

    Second, supply the plan, that meets customer's demands.

    youdao

  • 研究了提前期不确定情况下总装生产物料需求计划的优化问题。

    Research on Bill of Material and Material Requirements Planning in MRP System;

    youdao

  • 监督实际送货品种数量规格发放物料需求计划符合

    Supervise all the goods species , quantity and spec can match with the material plan;

    youdao

  • 根据收到的销售预测操作运行物料需求计划报表输出物料计划并监督执行。

    Run Material Requirement Plan against Forecast and output material requirement plan, monitor material availability.

    youdao

  • 物料需求计划理论方法进行研究,并物料需求计划系统进行逻辑计划

    It was studied that Theory of Material Requirements Planning and designed of Material Requirements Planning System.

    youdao

  • 本文对物料需求计划理论方法进行研究,并物料需求计划系统进行逻辑设计

    It was studied that Theory of Material Requirments Planning and designed of Material Requirments Planning System.

    youdao

  • 物料需求计划系统目的准时生产减少库存实现单个企业内部最优化生产。

    MRP system is aimed at the production time and reduce inventory in order to achieve a single enterprise to optimize production.

    youdao

  • 第五提出了面向动态需求物料需求计划算法阐述基本原理,给出面向对象的算法实现。

    In the fifth chapter, Material Requirement Planning (MRP) based on separative BOM is brought forward, and its recursion algorithm is given.

    youdao

  • 用户可以制定物料需求计划同时考虑有关所有供应订单溯源,并适当使用项目参考生成计划订单。

    The user can plan material requirements while respecting hard pegs on all supply orders and generate planned orders with Seiban references appropriately.

    youdao

  • 本文香精香料行业为背景,行业内物料需求计划决策复杂性进行分析研究后,给出套切实可行解决方案

    It studies the complexity in making the decision about the material requirement planning of essence and flavor industry and finds out a feasible project to resolve the issue.

    youdao

  • 物料需求计划MRP系统对于车间层,尤其是基于车间-工段-班组车间层的作业计划控制不是有效的。

    MRP system is not very efficient in production planning and control of job shop, especially of the one that contains three-level structure: shop, subshop and workgroup.

    youdao

  • 文章介绍一个基于B/S模式小型ERP系统设计,系统包含了库存管理物料需求计划销售计划、主生产计划采购计划等核心功能模块

    The paper introduces the design of a small ERP based on B/S mode. The system includes stock, material requirement, selling, planning, and purchasing module of ERP.

    youdao

  • MRP(Materials RequirementsPlanning物料需求计划)特别应用于装配生产计划工具目的在于使每个制造单元可以告诉供应商需要什么零件什么时候需要。

    MRP is a planning tool geared specifically to assembly operations. The aim is to allow each manufacturing unit to tell its supplier what parts it requires and when it requires them.

    youdao

  • 参与年度预算工作中的相关工作,包含长期计划物料采购计划库存计划SAP系统完成LTP需求制定。

    Perform annual budget related to long term planning, material purchasing planning and inventory planning, and execute LTP in SAP.

    youdao

  • 确保所有供应的物料能够满足生产计划需求

    Ensures all material requirements are sufficient for production schedules.

    youdao

  • 专门评估物料产能需求根据需求制定计划及作出时间安排的工作。

    Activities that focus on evaluating demand for material and capacity and formulate plans and schedules based on meeting that demand.

    youdao

  • 根据生产计划,生产任务单进行物料需求MRP运算与采购进度的跟进协调;

    Based on production planning and relevant WOs to determine according material requirement plans through calculation by running MRP module of ERP.

    youdao

  • 根据订单产品物料清单、工艺路线,结合工作中心能力计划,预估满足客户需求的程度,来安排自身的生产外协提高对客户需求的响应能力

    According to BOM, routing and capacity planning of work centers, it detects whether or not to satisfy customer demand, and then arranges production and outsourcing to improve customer service level.

    youdao

  • 某段时期实际需求预测需求比较,以得出物料计划系统需求

    The requirements for material planning systems is generated by the comparison between the actual demand and the forecasted demand at given period.

    youdao

  • 每周制定材料需求计划发放物料供应进度”。

    Do MRP analysis and release "supply schedule material" on a weekly basis.

    youdao

  • 每周制定材料需求计划发放物料供应进度”。

    Do MRP analysis and release "supply schedule material" on a weekly basis.

    youdao