详细介绍了深圳妈湾发电厂机组滑参数停机、制冷却的方法及过程。
In this paper, the operation process of variable-parameter shutdown and forced cooling of300 MW units in Mawan Power Station is described at length.
介绍了S109FA机组温度匹配的目的及原理;分析了机组在冷态开机过程中的汽机卸载现象及优化开机程序;最后,介绍了温度匹配法滑参数停机的目的、详细操作步骤、注意事项等。
The paper introduces the purpose and principle of temperature matching of S109FA unit, analyzes load rejection phenomena of turbine during cold-state start-up, and optimized start-up procedure.
介绍了S109FA机组温度匹配的目的及原理;分析了机组在冷态开机过程中的汽机卸载现象及优化开机程序;最后,介绍了温度匹配法滑参数停机的目的、详细操作步骤、注意事项等。
The paper introduces the purpose and principle of temperature matching of S109FA unit, analyzes load rejection phenomena of turbine during cold-state start-up, and optimized start-up procedure.
应用推荐