• 最后解析测图仪aps—1利用我国西南地区一个1ap立体像对进行了试验,取得了一些有益结论

    Finally, in analytical plotter APS-1, some beneficial results using a panchromatic SPOT stereo pair of level 1ap over the area of Southwest of China are presented.

    youdao

  • 安装一个三脚架上平坦画板,照准一起用于野外制地形地质

    A flat drawing board mounted on a tripod used in combination with an alidade to construct topographic or geologic maps in the field.

    youdao

  • 描述8031单片机实现基于的无创伤血压监护给出硬件的原理软件算法框

    This paper describes a type of blood pressure monitor we have developed using 8031 chip microprocessor based on oscillometric method and the designs of hardware and software.

    youdao

  • 通过经纬绘法1:50 0地形过程各个工序分析,得出了1:50 0地形上的点位中误差

    Through the analysis on every procedure of surveying 1:500 topographic map with the method of transit mapping, the position error of 1:500 topographic map is got.

    youdao

  • 体积鼠脑TTC染色后,计算机病理分析出梗死面积,根据梯形法则计算出梗死体积梗死体积比。

    The rat brains of the group measured volume were dyed with TTC and measured the area by computerized pathological image analyzer.

    youdao

  • 如果rtk全站联合测图上述弊端可以克服

    If combined with RTK and total station mapping, these drawbacks can be overcome.

    youdao

  • 简述全站构成控制点基本原理,分析布设根控制点的量精度得出结论。

    The form of electronic total station and the basic principle of determining and setting up root control points were related briefly. The accuracy of setting up root control points was analysed.

    youdao

  • 对比方法着重分析了提高精度原因,并DM 502红外反射安置方法作了较详细的叙述。文章后谈到了DM 502红外绘地形的优点。

    Through comparison it is mainly discussed why the accuracy of mapping can be improved using DM502 as well as how to set the reflector related to DM502.

    youdao

  • 为适应全站路线中线点纵横断面,并采集外业观数据,输入计算机绘制路线的纵横断面实现路线量的综合一体化

    The route laying-out, longitudinal sections or cross-sections drawing, field data collecting with computer are combined to realize the route survey integration.

    youdao

  • 全站地形方法全站测图工作过程主要数据采集、数据处理、编辑形输出。

    Total station topographic mapping method Total station mapping of the work process are: data collection, data processing, graphics editing and graphics output.

    youdao

  • 全站地形方法全站测图工作过程主要数据采集、数据处理、编辑形输出。

    Total station topographic mapping method Total station mapping of the work process are: data collection, data processing, graphics editing and graphics output.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定