• 提出地下连续墙-桩-所构成的复合基础沉降计算方法方法定义二阶段沉降计算方法。

    A settlement computation method to the composite foundation composed of slurry wall-pile-box or thick raft is proposed, which is defined in the paper as two-stage settlement computation method.

    youdao

  • 进入细砂不断沉降刮板不停外。

    After the mud enters into the box, smaller sand constantly sediment to the bottom of box and is pulled out from the box.

    youdao

  • 进入细砂不断沉降刮板不停外。

    After the mud enters into the box, smaller sand constantly sediment to the bottom of box and is pulled out from the box.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定