提出了由地下连续墙-桩-箱或筏所构成的复合基础的沉降计算方法,该方法定义为二阶段沉降计算方法。
A settlement computation method to the composite foundation composed of slurry wall-pile-box or thick raft is proposed, which is defined in the paper as two-stage settlement computation method.
进入箱体后细砂不断沉降到箱底被刮板不停的带出箱外。
After the mud enters into the box, smaller sand constantly sediment to the bottom of box and is pulled out from the box.
进入箱体后细砂不断沉降到箱底被刮板不停的带出箱外。
After the mud enters into the box, smaller sand constantly sediment to the bottom of box and is pulled out from the box.
应用推荐