结合某沉箱预制厂现场作业情况,以安全系统工程分析法和故障树分析法,分析沉箱预制过程存在的危险因素,并提出安全控制措施。
The results of the two techniques have been compared and the measures for prefabrication of caissons in winter seasons are also proposed.
结合某沉箱预制厂现场作业情况,以安全系统工程分析法和故障树分析法,分析沉箱预制过程存在的危险因素,并提出安全控制措施。
The results of the two techniques have been compared and the measures for prefabrication of caissons in winter seasons are also proposed.
应用推荐