项目管理计划不是横道图,是一系列管理计划。
A project management plan is not a bar chart, but a series of management plans.
偏差分析法中的横道图法简单明了,能够准确表达出费用的绝对偏差。
In warp analysis, horizontal line method is simple and can exactly expression cost difference.
本法的主要思路是从初始峰值曲线与初始横道图出发,逐次迭代调整而得最优解。
The gist of this method lies in that, starting from initial peak value curve and initial horizontal bar graph, the optimal solution is found by way of successive iterations and modifications.
计划通常是文件。不要陷入陷阱,例如,认为一张甘特横道图是一个计划,它仅仅是一张进度表而已。
Plans are always documents, don't fall into the trap of thinking that, for example, a Gantt chart is a plan - its only a schedule diagram.
[摘要]在工程施工进度网络计划基础上,提出绘制施工进度计划综合横道图的思路及绘制步骤。
Abstract: Based on the construction schedule network planning, this paper puts forward the idea and draw steps of compositive horizontal line graph to construction schedule.
作为一种先进的方法,网络计划技术在施工管理中应与横道图结合使用,在招投标工作中更应很好地运用。
As an advanced method, the CPM should be combined with the Gantt chart in construction management, and it can be especially well used in tendering.
本文主要阐述了横道网络图的绘制及节点参数的简易计算方法。
This paper states across line network drawing and node parameter facility calculating method.
本文主要阐述了横道网络图的绘制及节点参数的简易计算方法。
This paper states across line network drawing and node parameter facility calculating method.