• 简要介绍了飞来峡水电站水轮机模型验收试验的情况及结果。

    This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station.

    youdao

  • 岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。

    Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.

    youdao

  • 通过模型验收试验结果进行详细的分析,结果显示除部分工况压力脉动值外,模型转轮各项性能满足合同要求。

    The results of model test were analyzed. It is concluded that the performance of the model turbine is satisfying, with presspulsation on some operation point exception.

    youdao

  • 文章就龙滩水轮机转轮水力设计模型试验、转轮结构设计、转轮工地制造转轮的最终验收,进行评述提出一些建议

    The thesis comments on the hydraulic design, the model test, the runner structure design, the runner field fabrication and the acceptance check. Some proposals are put forward also.

    youdao

  • 文章就龙滩水轮机转轮水力设计模型试验、转轮结构设计、转轮工地制造转轮的最终验收,进行评述提出一些建议

    The thesis comments on the hydraulic design, the model test, the runner structure design, the runner field fabrication and the acceptance check. Some proposals are put forward also.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定