简要介绍了飞来峡水电站水轮机的模型验收试验的情况及结果。
This paper presents the turbine model acceptance test and the test results of Feilaixia hydropower station.
岩滩水电站水轮机性能采用模型验收试验方式验收。其全模拟模型最高效率达到92%。
Model acceptance test is applied to accept Yantan turbine performances. The model efficiency maximum is 92 percent in the completion of similar prototype.
通过对模型验收试验的结果进行详细的分析,结果显示除部分工况点的压力脉动值外,模型转轮的各项性能满足合同要求。
The results of model test were analyzed. It is concluded that the performance of the model turbine is satisfying, with presspulsation on some operation point exception.
文章就龙滩水轮机转轮的水力设计、模型试验、转轮结构设计、转轮工地制造及转轮的最终验收,进行评述并提出一些建议。
The thesis comments on the hydraulic design, the model test, the runner structure design, the runner field fabrication and the acceptance check. Some proposals are put forward also.
文章就龙滩水轮机转轮的水力设计、模型试验、转轮结构设计、转轮工地制造及转轮的最终验收,进行评述并提出一些建议。
The thesis comments on the hydraulic design, the model test, the runner structure design, the runner field fabrication and the acceptance check. Some proposals are put forward also.