介绍了建筑物条形基础的爆破拆除。
This paper introduced the blasting demolition of a strip-shaped base.
介绍了如何用地基系数法计算条形基础;列举了具体实例。
It is presented that how to calculate the strip footing with coefficient of ground and the specific examples are listed.
土地性质决定了柱子下面采用浅的柱式基础,而墙下则采用条形基础。
Geotechnical situation determined to use post-type shallow foundations under columns and strip foundations under the walls.
在现场试验基础上对条形基础下刚-柔性桩复合地基进行有限元模拟分析。
The composite foundation with rigid-flexible piles under strip foundation is analyzed by FEM on the basis of field tests.
选取筏板基础方案,采用缺口梁方法,可以解决石砌体墙下条形基础加固问题。
Raft foundation was adopted to solve this problem and notched beams were used to strengthen the old strip foundation under masonry wall.
附近挖掘的条形基础承载力系数的估计是由使用的运动学极限分析方法在本文中。
An estimate of bearing capacity coefficients for a strip footing near an excavation is made by using the kinematical approach of limit analysis in this paper.
结果表明,推导的条形基础上限解能够很好地求解复合加载模式下地基的极限承载力。
The results indicate that the upper-bound solution of strip footing due to combined loading is accurate to calculate the bearing capacity of foundation perfectly.
文章以某综合楼的结构优化设计为例,主要介绍了柱下交叉条形基础大体积混凝土的施工要点。
Taking the optimized structural design in a complex building as an example, the article introduces the essentials in the cross strip foundation mass concrete construction.
复式基础的基座也会大得几乎彼此相连,但与条形基础不同,它可以承受一排以上柱子的荷载。
Combined footings are those in which the pads would also be so large that they nearly touch, but unlike strip footings, they may carry the load from more than one row of columns.
以一个简化的基础平面为例,导出计算误差较小的建议公式,以改进墙下条形基础宽度的计算方法。
Taking a simplified foundation plane ast he example, this paper derives a recommended formula with less calculation errors, improving the method for calculating the width of strip foundation.
勃郎特-维西克研究的条形基础极限承载力属于平面应变问题,采用分步叠加法,求得地基极限承载力公式。
Prandtl-Vesic of ultimate bearing capacity of strip foundation belongs to the plane strain problems, which adopt step superposition method to obtain the formula of ultimate bearing capacity.
根据砌体结构地基反力均匀分布的特点及竖向静力平衡原理,提出一种简便易行的调整条形基础宽度的实用方法。
According to the uniform distribution of ground reaction and the principle of vertical static balance in masonry structure, we can sum up a convenient pragmatic method to adjust strip-base breadth.
墙下条形基础与静压桩基结合使用,对于弱地基上的多层混合结构建筑是一种既能缩短工期,又能降低造价的设计、施工方案。
Joint utilization of strip foundation under wall with static press pile is a kind of design and construction plan which can reduce man-hours and building costs.
对柱下条形基础底板和梁的设计前后相关问题以及常用的两种简化计算方法的适用条件和相互关系进行了综述,提出了自己的一些看法。
The contextual problems about the design of soleplate & beam and the applicability & interrelation of two calculation methods are summarized. The detailed design procedure are concluded.
接下来本文进一步研究了饱和地基上条形弹性基础的摇摆振动问题。
Then, the rocking vibration analysis of elastic strip foundation resting on saturated grounds is investigated.
本文在平面应变条件下研究了饱和地基上条形刚性基础的摇摆振动问题。
The rocking vibration analysis of rigid strip foundation resting on saturated soils is studied under conditions of plane strain.
以圆形浮阀的计算公式为基础,探讨了条形浮阀的计算方法。
Based on the calculating formulas of round floating valves, the calculating method of strip floating valves was discussed.
“基础笔记”公司还会给用户一个条形码,用以代表其体味档案——如果你把两个体味档案叠加,你就可以看到他们的匹配程度。
Basisnote also gives users a 15 bar code that represents their scent profile-if you put two scent profiles on top of each other, you can see how well they match.
特别在此基础上推出了条形药包下破裂深度计算公式,对工程实践有积极的指导作用。
The formula for the depth of the fracture region under the linear charge is developed, It will be of helpful for engineering design practice.
为实现快速的条形指纹图像拼接,在两步相关方法的基础上,改进预处理和块相关操作,进一步加快条形指纹图像拼接速度。
To implement a fast slice fingerprint image synthesis, an improved method of pre-operation and two-step correlation is adopted to further accelerate the synthesis speed.
在构件加固方面,采用大直径挖孔桩和条形承台加固基础,以满足剪力墙基础受力要求;
As respect of member reinforcement, large diameter stakes are applied to reinforce the foundation of new shear-wall.
基于工程实际本文分别研究了下卧饱和半空间弹性土层上条形刚性基础和弹性基础的摇摆振动问题。
Utilzing this model, the rocking vibrations of the rigid and flexible foundation resting on saturated ground with an elastic layer are studied.
方法:基于“军卫一号”工程软、硬件平台,以消耗品管理系统模块为依托,在提取相应源代码的基础上,在原有系统中增加条形码输入、输出模块。
Methods Based on No. 1 Military Medical Project and Consumables Management system, source codes were extracted and bar code input and output modules were added into original system.
方法:基于“军卫一号”工程软、硬件平台,以消耗品管理系统模块为依托,在提取相应源代码的基础上,在原有系统中增加条形码输入、输出模块。
Methods Based on No. 1 Military Medical Project and Consumables Management system, source codes were extracted and bar code input and output modules were added into original system.