• 采用人工桩桩技术使承载力提高50%。

    The pile supporting capacity can be raised 50% after using man-power hole pile mud jacking technology.

    youdao

  • 应用的经验公式及其计算参数可供类型地质人工设计参考

    The empirical formula and calculation parameters can be used in design of post grouting man power mine pile on the same geological type with reference value.

    youdao

  • 同时验证人工承载力可以通过经验公式进行估算

    It is also verified that the bearing capacity of post grouting manpower mine pile can be estimated by empirical formula.

    youdao

  • 同时验证人工承载力可以通过经验公式进行估算

    It is also verified that the bearing capacity of post grouting manpower mine pile can be estimated by empirical formula.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定