• 如果挖掘深度超过4指派一名土建工程师进行负荷计算支护设计开挖期间监督支护施工

    If the excavation is more than 4 meters in depth, he will assign a Civil Engineer to provide a load calculation, shoring design and oversee the shoring construction during excavation.

    youdao

  • 挖掘接触压力越大,偏心距开挖深度影响也越大。

    It was indicated that the influence of eccentricity on excavation depth increased with the increase of contact pressure.

    youdao

  • 一般粘性土自上而下分层开挖,每深度60cm开挖部逆向倒退踏步挖掘

    Generally clay can be excavated from top to bottom by layer with the appropriate depth 60cm. backward excavate from the end by stepping type.

    youdao

  • 一般粘性土自上而下分层开挖,每深度60cm开挖部逆向倒退踏步挖掘

    Generally clay can be excavated from top to bottom by layer with the appropriate depth 60cm. backward excavate from the end by stepping type.