按照拆卸顺序安装推杆、摇臂、枢轴和桥臂。
Install the push rods, rocker arms, pivots and Bridges in the order they were remove.
装配完成后,用手转动泵轴,没有擦碰现象,转动比较轻滑均匀即可,拆卸可按上述装配顺序相反的进行。
After assembly, move the pump shaft with hand, it should be smooth and uniform without touch. Disassembly can be made with the steps contrary to above ones.
按照拆卸的相反顺序重新组装安全阀。
Reassemble the relief valve in the reverse order that it was disassembled.
一般来说,装配的顺序与拆卸相反。装配时,应确保变速器的配合面和飞轮壳的清洁。
In general, installation is the reverse of removal. be sure the matching faces of the transmission and the flywheel housing are clean.
这里使用遗传算法来规划拆卸序列,产生满足约束条件的效率最好的顺序。
This paper use GA to deal such kind of problem, which can generate an optimal sequence under constraint of disassembly priority.
但是拆卸过程涉及到大量的因素,如何充分考虑这些因素,适当调整顺序,得到效率最大化的拆卸序列是十分复杂的问题。
There are so many elements relative to the disassembly process, so it is a complicated issue that how to consider the factors, adjust the sequence properly and given the best disassembly sequence.
但是拆卸过程涉及到大量的因素,如何充分考虑这些因素,适当调整顺序,得到效率最大化的拆卸序列是十分复杂的问题。
There are so many elements relative to the disassembly process, so it is a complicated issue that how to consider the factors, adjust the sequence properly and given the best disassembly sequence.
应用推荐