这个废料坑位于一处水力压裂钻探场,它再次揭示了对废料坑的再次开采。
This image shows another waste pit at a hydro-fracing drill site. Again, we see a waste pit for drilling mud.
在厄瓜多尔舒舒分地61区的热带丛林中,一排排的树木和生锈的带刺铁丝围栏之后,藏匿着一处石油废料倾倒坑,周围肮脏的地上尚留有车辙。
HIDDEN behind a row of trees and a rusted barbed-wire fence on a rutted dirt road in the Ecuadorean jungle, Shushufindi 61, a pit in which oil waste is dumped, is hardly a beauty spot.
用重夯按一定夯距夯击软土地基,在夯击坑中填充建筑废料,再进行夯实。
We should ram the soft ground with heavy rammer awarding to certain distance, fill up the pit with construction wastes, and tamp again.
用重夯按一定夯距夯击软土地基,在夯击坑中填充建筑废料,再进行夯实。
We should ram the soft ground with heavy rammer awarding to certain distance, fill up the pit with construction wastes, and tamp again.
应用推荐