• 华东电网电力需求有较快的增长,到2007最大负荷增长有所放缓。

    The electric power demand of East China Power Grid keeps increasing in recent years and the growth of its maximum load was a little bit slower in 2007.

    youdao

  • 即使富裕国家经济继续负荷运转,这些国家2011也可以说正在迈向至少四十他们最大集体预算紧缩

    Even though the rich world's economies continue to operate below capacity, in 2011 they are heading for what is likely to be their biggest collective budget squeeze in at least four decades.

    youdao

  • 设计评审对试运行(最大试运行时间2负荷情形下4000小时)有效

    The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.

    youdao

  • 提出几种最大降温负荷测算方法,并利用实例进行了验证,结果表明所提出的测算方法可行的。

    Several methods are proposed to calculate the yearly maximum cooling load. They are verified by examples and the results show that the methods are feasible.

    youdao

  • C设计评审对试运行(最大试运行时间2负荷情形下4000小时)有效

    The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.

    youdao

  • C设计评审对试运行(最大试运行时间2负荷情形下4000小时)有效

    The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定