研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.
研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。
Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.