• 例如工程签证就是索赔中的一个重要内容

    Such as engineering visas, the claim is an important element.

    youdao

  • 工程签证就是工程项目常规工作内容

    Visa, and the works of the project is the work of the conventional content.

    youdao

  • 申请485签证时候已经通过了合格的技术评估那么我是否还需要通过适工程序(jrp)的评估?

    Will I be required to meet the JRP as I already hold a suitable skills assessment obtained when applying for my subclass 485 visa?

    youdao

  • 如果在2010年1月1日之前申请了永居技术移民签证那么不再需要通过适工程序(jrp)评估

    If your application was lodged before 1 January 2010, you are not required to meet the JRP as part of your skills assessment provided your application is for a permanent GSM visa.

    youdao

  • 同时工程实施阶段运用过程控制原理控制清单子目完成情况,对现场签证索赔管理进行了论述。

    At the same time, it applies process controlling theory to engineering execution phase to control the items of B. Q, and discourses visa and claiming for compensation management.

    youdao

  • 合同计量监理工程现场签证为准。

    Measurement was attested by supervising engineer in this contact.

    youdao

  • 负责工程项目工程施工准备开始直至验收交工,以及签证结算全过程施工管理工作

    Responsible for the project from construction preparation to completion acceptance, the whole process of construction management and settlement.

    youdao

  • 是在2010年1月1日之前申请永居移民技术移民签证尚未获得技术评估,那么我是否需要通过适工程序(jrp)的评估?

    I lodged my General Skilled migration (GSM) visa application for permanent migration before 1 January 2010 and have not yet received my skills assessment. Am I required to meet the JRP?

    youdao

  • 许多外国大学生源源不断涌入美国大学,攻读科学技术工程以及数学的硕士博士学位但是很多毕业之后无法拿到在美国工作生活签证

    Many foreign students come to the United States to earn advanced degrees in science, technology, engineering and math. But many are unable to get a visa to live and work here after they graduate.

    youdao

  • 本文介绍了与工程造价相关工程计量签证工程变更竣工结算审核几个环节的相关管理

    This paper introduces the management of such links as project measurement verification, project alteration and completion audit relating to engineering project cost,.

    youdao

  • 任何一强迫对方使用不合格建筑材料设备构配件于本工程的,都要签证记录在案,由此引起一切后果由强迫一方负责。

    Either party was forced to apply unqualified building materials, devices and component and fittings which shall be attested and placed on record. Aftermath shall be on the forcer's head.

    youdao

  • 哪些签证职业受到工程序规管?

    Which visas and occupations are subject to the JRP?

    youdao

  • 设计变更工程签证工程进度款支付审核管理工作

    In charge of design changes, engineering quantity visa, project payment progress and audit management;

    youdao

  • 文章诠释工程结算审核一般内容分析了签证索赔反驳

    This article annotates the general contents about the audit of the project cost, also emphatically analyzes the refutable measures against the confirmation and counterclaim of a project.

    youdao

  • 现行的工程清单计价方法工程竣工结算一般合同价材料签证索赔部分组成

    BOQ existing valuation methods, the project completed by the contract price settlement in general, materials transfer and visa poor claim is composed of three parts.

    youdao

  • 第二十六条第二十四条第一项之空气污染防制计画依法登记执业环境工程技师其他相关专业技师签证

    Article 26 the air pollution control plan in Article 24, Paragraph 1 shall be signed by a legally registered and practicing environmental engineer or other relevant professional engineer.

    youdao

  • 第二十六条第二十四条第一项之空气污染防制计画依法登记执业环境工程技师其他相关专业技师签证

    Article 26 the air pollution control plan in Article 24, Paragraph 1 shall be signed by a legally registered and practicing environmental engineer or other relevant professional engineer.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定